{"id":4371,"date":"2023-08-14T16:20:43","date_gmt":"2023-08-14T20:20:43","guid":{"rendered":"https:\/\/www.rockefellergroup.com\/?post_type=wpsl_stores&p=4371"},"modified":"2025-01-30T15:43:01","modified_gmt":"2025-01-30T20:43:01","slug":"patterson-commerce-center","status":"publish","type":"wpsl_stores","link":"https:\/\/www.rockefellergroup.com\/developments\/patterson-commerce-center\/","title":{"rendered":"Patterson Commerce Center"},"content":{"rendered":"\n
\n
\n

About the development<\/h2>\n<\/div>\n\n\n\n
\n

Patterson Commerce Center, a 259,951-square-foot distribution facility, was recently completed by Rockefeller Group on 14 acres in Perris, CA. Situated adjacent to Optimus Logistics Center, a 1.4 million-square-foot logistics project completed and sold by the company in 2018, Patterson Commerce Center benefits from its prime location in the heart of Southern California\u2019s logistics hub.\u00a0<\/p>\n\n\n\n

Located at Patterson Avenue and Washington Street, the site offers excellent freeway access with frontage on the I-215 Freeway, as well as proximity to I-10, I-15, and Route 60. The project is also within reach of Ontario International Airport and the Ports of Los Angeles and Long Beach, providing strategic connectivity for regional and national distribution. <\/p>\n<\/div>\n<\/div>\n\n\n\n

\n
Visit Website<\/a><\/div>\n<\/div>\n\n\n\n

0<\/h3>Square Feet<\/span><\/div>

0<\/h3>Trailer Stalls<\/span><\/div>

0<\/h3>Completion Date<\/span><\/div><\/div><\/div>\n\n\n\n
<\/div>\n\n\n\n
\"\"<\/figure>
\n

Key Features<\/p>\n\n\n\n

Rockefeller Group worked closely with the City of Perris to secure entitlements for the project, which were finalized in July 2023, with construction completed in September 2024. Key features of the building include a 36-foot clear height, 56′ x 60′ column spacing, 145 auto-parking spaces, and a 185’\u2013240′ truck court with 59 trailer stalls.<\/p>\n\n\n\n

Joe McKay, Michael McKay, and Michael Fine of Lee & Associates represented Rockefeller Group throughout the land acquisition and leasing process. The building was designed by HPA Architects, engineered by Huitt-Zollars, and constructed by RM Dalton.<\/p>\n<\/div><\/div>\n\n\n\n

Location<\/h2>\n\n\n\n
<\/div>\r\n